The Premise of the Design
Having given only a brief introduction to the building in Where it all Began, this post outlines in more...
Read MoreThe Internal Layout and Moving In: January 2015
When we first started moving things into the building, it was early January 2015. The internal temperature registered at...
Read MoreDiathonite Insulating Lime Plaster – Part 3, Installation
This is a short post showing videos and photos of the Diathonite being applied. It was a busy three...
Read MoreDiathonite Insulating Lime Plaster – Part 2, Detailing and Preparation
In Part 1 of this topic I described the process of evaluating the options for internally insulating the front...
Read MoreDiathonite Insulating Lime Plaster – Part 1, Product Evaluation
Last month Jasper and his team from Border Lime Construction came to install Diasen Diathonite, a breathable, insulating lime...
Read MoreWhere it all began…
The Retrospective Retrofit charts the progress of our building project, conversion, extension, and retrofit, here in the Lune Valley....
Read More